top of page

24/4 - Easter Week 3 Mini Evaluation

2004946

Updated: May 3, 2022

This week I feel like I have been quite productive, and I am quite proud of the progress I have made.


All I need to do now is borrow equipment from UCA and actually start making.

Screenshot from timetable showing Easter Break Week 3 and Week 6


Referring back to my timeline, all I haven’t done is to physically start filming, which I will do as soon as possible, after I have got myself a tripod and lighting.


I have put in my request to borrow equipment, which I will pick up tomorrow at 3pm. I have done my blog posts, met with my actors, and done this mini evaluation. So I am feeling a bit better about where I am currently sitting in this project.


I still can’t help but feel behind, but I think after I have confidently filmed my scenes, I will feel a lot more confident in my ability to finish the project in the way I want to.


Next week:

I ideally want to finish filming next week, so I can move onto the editing and the promotional part of my project, but if my lighting experimentation and tests don’t go to plan I might have to allocate more time for filming.


I know that the editing will take longest, based off of experience from previous projects, so I need to make sure I save enough time to do that, as the last thing I need is for me to run out of time and not get it done.


Moving forward into next week I want to have experimented a bit more with real lights, to make me a bit more confident before filming. However I also want to film all the shots for my film, and have all of the scenes ready to start editing.

1 view0 comments

Recent Posts

See All

Comments


bottom of page